More long, hot days on the way
Tasmania's mild summers will soon be a thing of the past, with climate researchers predicting an increase in the number of hot days and the length of heat waves. abc.net.au |
Delay for $150 pipeline project
A $150 million pipeline project to safeguard the ACT's water supply has been delayed. abc.net.au |
NSW 'will struggle to find water savings'
Premier Kristina Keneally says New South Wales will struggle to find the water savings required in the plan to revitalise the Murray Darling river system. abc.net.au |
Burke to meet with basin irrigators
Federal Water Minister Tony Burke has called a meeting with irrigation groups tonight as the Government faces a growing backlash against proposed cuts to water allocations in the Murray-Darling basin. abc.net.au |
Inquiry told of 37 desal work site injuries
SA Water has told a parliamentary inquiry there have been 37 injuries at the Adelaide desalination plant construction site. abc.net.au |